What are the three types of submittals?
Submittals can be categorized as follows:
- Preconstruction Submittals.
- Construction Submittals.
- Closeout and Maintenance Submittals.
What is a submittal package in construction?
A submittal package is a container that stores one or more submittals. Typically, a general contractor creates submittal packages that list all of the individual submittals specific to a particular trade or subcontractor.
How do you create a submittal in construction?
Steps
- Navigate to the project’s Submittals tool.
- Click + Create > Submittal.
- Create a new submittal as follows: Add General Information. Update the Delivery Information. Create a Distribution List. Calculate Submittal Schedule Information (If Enabled) Apply a Submittal Workflow Template. Add Users to the Submittal Workflow.
How do you handle construction submittals?
Refuse to review any submittals sent directly to the architect or engineer by the subcontractor, and forward them to the general contractor. Refuse to review any unspecified submittals, and return them to general contractor. Require the general contractor to provide a submittal schedule as part of the contract.
Who is responsible for submittals?
A submittal refers to the written and/or physical information provided by a responsible contractor (i.e., contractors and subs) to the general contractor. This information is submitted to the design team for approval of equipment, materials, etc. before they are fabricated and delivered to the project.
What are the types of submittals?
Various types of submittals are part of the construction process. These include action submittals, informational submittals, those furnished as part of project closeout, and those that are considered maintenance material.
What does a submittal look like?
Submittal items include schedules, meeting minutes, product data, shop drawings, test data, product samples, warranties, and operations and maintenance (O&M) data. A large project, with dozens of subs, may have 500 or more individual submittals.
What should be included in a submittal?
What should I look for when reviewing submittals?
The contractor’s transmittal should list the applicable specification section number, title and paragraph number and drawing detail as references for the submittal. Without a transmittal you will be guessing at the scope of work covered by the submittal.
Is a submittal a contract document?
Submittals are not contract documents. The contractor prepares submittals, and the architect prepares contract documents. A201 states: 3.12.
What is the difference between a transmittal and a submittal?
A submittal is a document, sample, or any other information that is presented for review or consideration, whereas a transmittal is a document that is sent along with other documents or files.
What does a construction submittal look like?
Construction submittals can consist of multiple elements. A submittal can include technical data, samples, shop drawings, production specifications and other written and physical information that will help the engineers, designers, and architects of a project to ensure the correct materials are used in new buildings.